Concrete Calculator UK

Work out exactly how much concrete you need in cubic metres, 25kg bags and cost. Enter the length, width and depth of your slab, footing or post holes and the calculator does the rest. Built for UK measurements, UK bag sizes and UK prices.

Measurements (in Meters)

Example: 15cm = 0.15m

%

Materials Needed

Raw Volume (No Waste)3
Estimated Total Weight7,560 kg
Total Volume RequiredIncluding 5% waste margin
3.15

20kg Premixed Bags

379 bags

25kg Premixed Bags

303 bags

Laying Concrete Guide

  • Minimum Depth

    For a garden shed base or patio, 100mm (0.1m) is usually sufficient. For driveways carrying vehicles, aim for 150mm (0.15m) minimum.

  • Why add wastage?

    Formwork is rarely perfectly square, the sub-base is rarely perfectly level, and spillage occurs. A 5% to 10% wastage margin prevents you from running short mid-pour.

  • Ready-Mix vs Bags

    If your total volume exceeds 1.5 m³, it is vastly easier (and often cheaper) to order a ready-mix concrete lorry rather than hand-mixing hundreds of heavy bags.

Export Materials List

Heading to B&Q, Wickes, or Travis Perkins? Generate a PDF of your exact material requirements using the button to show the builder's merchant desk exactly what you need.

How to Calculate Concrete Volume

Whether you are pouring footings for a new house extension, laying a heavy-duty driveway, or simply establishing a small 100mm slab for a wooden shed, accuracy is vital. Getting your volume measurements wrong means either frantic mid-pour trips to the DIY store or paying exorbitant fees for surplus concrete disposal. Use our Concrete Calculator to eradicate the guesswork entirely.

The Mathematics of Concrete Volume (m³)

Volume is simply a measurement of 3D space. To determine the volume of a standard rectangular or square slab, you multiply the Length, Width, and Depth together.

Length (m) × Width (m) × Depth (m) = Volume (m³)

For example, if you are designing a patio that stretches 5 meters out from your house, is 4 meters wide, and 15 centimeters deep, you must first ensure all units match. Convert 15 centimeters to meters (0.15m), and compute: 5 × 4 × 0.15 = 3 cubic meters (m³).

How much does a cubic meter of concrete weigh?

The density of standard C20 or C30 structural concrete is generally considered to be roughly 2,400 kilograms per cubic meter. That is 2.4 metric tonnes. This is crucial to know if you are hand-mixing it from bags, or determining if your sub-base and formwork can physically handle the hydraulic pressure and weight of wet concrete.

Bag Conversions

If you are opting to buy premixed bags (containing Portland cement, sand, and aggregate) from a British DIY store like Wickes or B&Q, they typically arrive in 20kg or 25kg formats.

  • To fill 1m³ of space, you need approximately 2,400kg.
  • Divided by 20kg bags, this equals 120 bags per cubic meter.
  • Divided by 25kg bags, this equals 96 bags per cubic meter.

When to hire a Ready-Mix Lorry?

Hand-mixing 120 bags of concrete (plus dragging them into your garden) is grueling, back-breaking labor that takes an entire day. Furthermore, concrete sets rapidly. If you mix too slowly, a "cold joint" forms where the old batch cures before the new batch is poured against it, creating immediate structural weakness. As a general rule of thumb, anything over 1.5 cubic meters warrants calling a local line-pump or ready-mix lorry.

Related [Construction & DIY]

Share this tool:

How to Calculate Concrete

Concrete is sold by the cubic metre (m³) in the UK. To find your volume, multiply length by width by depth with everything in metres.

Volume (m³) = Length (m) × Width (m) × Depth (m)

So a 3m × 3m shed base at 100mm deep works out as 3 × 3 × 0.1 = 0.9 m³.

Depth trips most people up because it is usually quoted in millimetres. Just divide by 1,000 to convert. 100mm becomes 0.1m and 150mm becomes 0.15m.

For circular post holes or columns, use π × radius² × depth. A 300mm wide post hole dug 600mm deep needs π × 0.15² × 0.6 = 0.042 m³ per post.

For odd shapes, split the area into rectangles, calculate each one separately and add the volumes together.

How Much Concrete for Common UK Projects

These figures show typical volumes at standard depths. Always measure your own site because ground is rarely perfectly level.

Project

Typical size

Depth

Volume

Shed base

3m × 2m

100mm

0.6 m³

Garden room base

4m × 3m

100mm

1.2 m³

Single garage floor

6m × 3m

150mm

2.7 m³

Driveway (one car)

5m × 3m

100mm

1.5 m³

Patio

4m × 4m

100mm

1.6 m³

Fence post hole

300mm dia

600mm

0.042 m³ per post

Strip footing

5m run

600mm × 300mm

0.9 m³

Driveways need a minimum of 100mm of concrete for cars and 150mm if vans or heavier vehicles will use them.

Bags or Ready Mix?

This is the decision that matters most for your budget and your back.

Bagged concrete suits jobs under roughly 0.5 m³. Think fence posts, repairs, small pads and path edges. A 25kg bag of premixed concrete yields about 0.012 m³, so you need around 85 bags for a full cubic metre. At £5 to £8 per bag that works out near £200 per m³ once mixed, and mixing that many bags by hand is a full day of hard graft.

Ready mix concrete becomes cheaper and far easier once you pass about 1 m³. A lorry delivers the exact grade you ordered, batched to British Standards and the pour is done in minutes. Most suppliers have a minimum load of 1 to 2 m³ and small loads under 4 m³ often carry a surcharge.

Volumetric (site mixed) concrete is the middle ground UK tradespeople often recommend. The truck mixes on site and you only pay for what you use, which removes the risk of over ordering. It is a smart choice when your volume is uncertain or access makes waste likely.

For fence posts specifically, postcrete is quicker than standard concrete. One or two 20kg bags fill a typical post hole and it sets in around ten minutes.

UK Concrete Grades Explained

Concrete strength is graded by its compressive strength in newtons. The higher the number, the stronger and more expensive the mix. Ordering the right grade matters because under specifying risks cracking and over specifying wastes money.

Grade

Also known as

Best for

C10

GEN 1

Blinding, kerb bedding, non structural fill

C20

GEN 3

Shed bases, garage floors, lightly loaded slabs

C25

ST 2 / RC25

House foundations, footings, extensions

C30

ST 3 / RC30

Driveways, paths, external slabs

C35

RC35

Commercial floors, heavy duty driveways, agricultural yards

C20 is too weak for a driveway that takes regular vehicle loads. Most UK suppliers recommend C25 or C30 for domestic driveways and C35 where HGVs or farm machinery are involved.

For foundations covered by Building Regulations, use certified ready mix rather than hand mixed bags. Building Control may ask to see the delivery ticket confirming the specified grade.

Ready Mix Concrete Prices UK

Standard domestic grades cost roughly £100 to £135 per m³ excluding delivery and VAT, with London and the South East typically 15 to 25% higher. Guide prices for 2026:

Grade

Price per m³

C20

£100 to £125

C25

£105 to £135

C30

£110 to £142

C35

£118 to £145

On top of the base price, budget for delivery charges, a small load surcharge of £40 to £80 if you order under 4 m³ and pump hire from around £275 per day if the lorry cannot reach the pour. Weekend deliveries usually cost more too.

Concrete Mix Ratios for Mixing by Hand

Mixing your own suits small jobs where a lorry is overkill. The two ratios UK DIYers use most:

1:2:4 mix (general purpose, roughly C20): 1 part cement, 2 parts sharp sand, 4 parts 20mm aggregate. Suits shed bases, paths and small slabs.

1:4 ballast mix: 1 part cement to 4 parts all in ballast. Ballast is sand and gravel already blended, which makes it the easiest option for beginners. Use 1:6 for lighter duty work like bedding.

Add water gradually until the mix is workable but not sloppy. Too much water weakens concrete, so aim for a consistency that holds its shape when you drag a shovel through it. Once water hits cement you have about two hours to pour and level, so prepare everything before you start mixing. One cubic metre equals roughly 20 wheelbarrow loads, which is worth knowing before you commit to borrowing it across the garden.

Before You Order

Add 5 to 10% for waste: Ground is never perfectly flat and some concrete always sticks to the mixer, the barrow and your boots. Running short mid pour creates a weak joint, so calculate from your maximum measurements and round up.

Never add water on site: It weakens the mix and invalidates the supplier's grade guarantee. If you need a wetter, more workable mix for pumping or trench fill, ask for a higher slump when ordering.

Check access: A fully loaded mixer lorry weighs up to 32 tonnes. Confirm gate widths, overhead cables and whether the truck can get close enough, otherwise you may need a pump or barrow crew.

Book ahead: Suppliers typically need 2 to 5 working days notice, longer in summer.

Let it cure: Keep foot traffic off for 24 to 48 hours and vehicles off for at least 7 days. Concrete reaches its design strength after 28 days.

FAQs

How do I calculate cubic metres of concrete?

Multiply length × width × depth in metres. A 4m × 3m slab at 100mm deep is 4 × 3 × 0.1 = 1.2 m³.

How many 25kg bags of concrete are in 1 cubic metre?

Around 85 bags. Each 25kg bag of premixed concrete yields roughly 0.012 m³. Check the yield printed on your bag as brands vary slightly.

How much concrete do I need for a 3m × 3m shed base?

0.9 m³ at 100mm deep. Order 1 m³ to cover waste or roughly 80 to 90 bags of 25kg premix if mixing by hand.

What is the difference between cement and concrete?

Cement is the binding powder. Concrete is cement mixed with sand, aggregate and water. A bag of cement alone will not set into usable concrete.

How much does a cubic metre of concrete weigh?

About 2.4 tonnes when wet. That is why depth errors get expensive fast and why barrowing large volumes is serious work.

What grade of concrete do I need for a driveway?

C25 or C30 at 100mm minimum depth for cars. Go to C35 and 150mm if heavy vehicles will use it.

How long before I can walk or drive on new concrete?

Walk on it after 24 to 48 hours. Keep vehicles off for at least 7 days. Full design strength takes 28 days.

Related Calculators

  • Concrete Weight Calculator UK
  • Shed Base Calculator UK
  • Post Mix Calculator UK
  • Building Garden Wall Cost Calculator UK
  • Self Levelling Compound Calculator UK
  • Tarmac Driveway Cost Calculator UK

References

  1. Cemex UK, Readymix Concrete Calculator:
  2. Heidelberg Materials UK, Ready Mixed Concrete Volume Calculator and Pricing Guide:
  3. RMS Concrete, Ready Mix Concrete Prices 2026:
  4. MyBuilder, Ready Mix Concrete Prices in 2026:
  5. BSI, BS 8500 Concrete Specification (UK complementary standard to BS EN 206)
  1. SoftwareApplication

Related [Construction & DIY]